LET’S TALK
Your next project.
Our first conversation.
Describe your crossing in the survey below, or send a general contracting or consultancy enquiry. For team development, use our dedicated training enquiry.
QUICK FORM • DOCUMENTS TO HANDOVER
Your crossing, in one page.
Quick selections, essential details, and a responsibility choice for each item: Client or HDD contractor.
Tick. Save. Email.
One form per crossing. Open the PDF in a supporting reader, complete, save and reopen to check. Email it with authorised evidence to Rruziek@outlook.com.
Attach and send files yourself; the email link does not send or attach automatically. The enquiry form below is separate.
Responsibility selections are proposed coordination scope and require agreement; they do not transfer contractual or engineering duties. Answers require verification—not readiness approval or permission to start.
Fill here optionally — English
Answers stay in page memory and are lost on reload or leaving. Save a text answer sheet and email it yourself. The PDF is a blank form, not a copy of these website answers.
Approximate values are acceptable for an enquiry; write Unknown where needed. Add exact locations and verified values in authorised attachments.
| Item | Status | Responsibility |
|---|---|---|
| Location plan, profile, levels & pipe data | ||
| Ground investigation & groundwater evidence | ||
| Utility records, detection & physical verification | ||
| Land access, crossing permits & owner conditions | ||
| Entry / exit areas, pipe staging & site access | ||
| Traffic / rail / waterway control arrangements | ||
| Approved design, pits / support & method plan | ||
| Water, fluids, spoil disposal & recovery plan | ||
| Crew, equipment, safety & emergency preparation | ||
| Pipe / joint QA, testing & tie-in arrangements | ||
| Reinstatement, as-built records & handover |
Available / ready is your report only, not verified acceptance. Blank responsibility means to be agreed. Do not assume client/contractor engineering obligations from a selection.
RABCO separately reviews open cut, HDD or other trenchless options and agrees the next step. No automatic method selection.
Do not share unauthorised documents or passwords. Emailed files are reviewed through the company inbox, not the website enquiry database. Privacy notice
PROJECT DISCUSSION
Let’s ask the
right questions.
For a useful first review, include the location, crossing length, pipe diameter, available ground information and intended timing. Send survey files and attachments separately by email.
Contact RABCO+966570303031Rruziek@outlook.com