00:00:00.000 --> 00:00:08.600
This review schematic is not to scale. Verify utilities and ground conditions before approving the crossing.

2
00:00:08.833 --> 00:00:20.753
Pilot drilling advances from entry to exit. Track progress and record the path. Stop and resolve deviations or abnormal fluid returns before continuing.

3
00:00:21.833 --> 00:00:32.993
Planned reaming enlarges the bore towards the rig. Tool sizes, fluids and load limits require approved engineering and manufacturer inputs.

4
00:00:33.208 --> 00:00:42.488
During pullback, the pipe follows the reamer and swivel from the exit. Support it and protect rotating and tensioned zones.

5
00:00:43.208 --> 00:00:48.448
Complete checks and records. This grants no operating authority.